Resources · Walkthrough

Watch an alarm become an approved work order.

An ID fan in a cement plant trips a vibration alarm. Here is what three agents do next — and where your engineers stay in control.

Three steps, one asset.

01

Watch

Agentic monitoring sees vibration rising on the fan bearing, groups the related alarms into one event and calls the RCA agent.

Agentic monitoring →

02

Diagnose

The Universal RCA Agent runs six failure-mode skills, ranks the likely causes and shows the evidence for each.

Universal RCA Agent →

03

Act

The work-order agent drafts the job with parts, crew and the next safe window, and routes it to a named approver.

Work-order agent →
Who does what
  1. 1Agentic monitoringSpots the vibration change.
  2. 2Universal RCA AgentRanks the causes, with evidence.
  3. 3Work-order agentDrafts the job.
  4. 4Your engineerApproves the work order.

What changes.

StepBeforeWith NexaStack
AlarmSits on a dashboardGrouped into one event and acted on
DiagnosisHours of data pullingRanked causes with evidence
Work orderWritten by handDrafted, checked and routed for approval
LearningOutcome rarely recordedConfirmed cause improves the next diagnosis

See it on your own asset.

In a live session we run the same loop on one of your critical assets, using your alarms, failure modes and work-order history.

Start with one critical asset.

A four-week assessment on one asset class: baseline, diagnosis, and a pilot plan your engineers sign off.