Capabilities · Maintenance work orders
From diagnosis to work order, ready to approve.
The work-order agent drafts the job your planner would write, with the evidence attached — so approval takes minutes and the repair fits the plan.
What the agent drafts.
A complete job, not a ticket that says "check fan".
The task
What to do, on which component, in what order.
Priority and window
Urgency from the diagnosis; timing from planned stops and production.
The evidence
Signals, ranked causes and photos attached for the approver.
Safety notes
Isolation, permits and hazards for the job.
- 1Diagnosis inCause and evidence from the RCA agent.
- 2DraftTask, priority, window and safety notes.
- 3CheckParts, crew and approval route.
- 4ApproveThe planner approves in your EAM.
- 5Close the loopThe outcome returns to the RCA agent.
Checked before it lands on the schedule.
Parts
Spares checked against stock before the job is raised.
Crew
Skills and availability matched to the task.
Approval routes
Routine jobs follow your rules; high-risk jobs go to a named approver.
Works with your EAM.
Your EAM stays the system of record. The agent writes into it rather than replacing it; Maximo and SAP PM connectors are scoped and confirmed during the assessment.
- Drafts land in your EAM for planner review.
- Approvals happen in the tools people already use.
- Repair outcomes flow back to the RCA agent, closing the loop.
Start with one critical asset.
A four-week assessment on one asset class: baseline, diagnosis, and a pilot plan your engineers sign off.